Turnovers
Make-ready checklist
A room-by-room checklist to turn a unit between tenants: the move-out walk, repairs, paint, safety checks, cleaning and the final punch list.
Last updated
Copy the whole template, then change it for your properties.
Or download it to fill in:
Word file (.docx)Use this on the day the keys come back. Work top to bottom, and book the trades in order: repairs, then paint, then flooring, then cleaning, then the final walk. The make-ready and turnover guide walks through each step.
Move-out walk
- Dated photos of every room, wall to wall, before any work
- Compare with the move-in photos, and note damage beyond normal wear for the deposit
- Collect every key, fob, remote and mailbox key
- Read the meters and record the numbers
Safety
- Test every smoke alarm and CO alarm, and check each manufacture date
- Replace batteries in alarms that use them
- Check the water heater for leaks and its temperature setting
- Look for exposed wiring, missing outlet covers and loose fixtures
- Rekey or change the locks
- Built before 1978? Use a lead-safe certified firm for any sanding, scraping or window work
Kitchen and bathrooms
- Run every faucet and shower, and check under each sink for leaks
- Flush every toilet and check it stops running
- Test the range, oven, hood fan, dishwasher, disposal and refrigerator
- Recaulk tubs, showers and sinks where needed
- Check bathroom fans run
Every room
- Patch and paint walls, and touch up trim
- Open and close every door and window, and check the locks
- Test every light, switch and outlet
- Replace the HVAC filter and test heating and cooling
- Clean or replace flooring as needed
Final walk and punch list
- Walk the unit after cleaning with this list in hand
- Write every small item left on a punch list, with the room
- Close the list, with a photo of each item
- Take listing photos once the punch list is closed
How to use it
- Walk the unit with this checklist the day the keys come back. The make-ready clock starts then.
- Take dated photos of each room before any work starts, for the deposit file.
- Book the trades in order: repairs first, then paint, then cleaning, then the final punch list walk.
- Test every smoke and CO alarm and record the date before the next tenant moves in. See smoke and CO alarms in rentals.
The guide behind it
Sources
- NFPA, Smoke alarm safety tips: testing and 10-year replacement. Checked October 20, 2026.
- CPSC, CO Alarms. Checked October 20, 2026.
- U.S. EPA, Lead Renovation, Repair and Painting Program. Checked October 20, 2026.
- ENERGY STAR, Heat and Cool Efficiently: filter changes. Checked October 20, 2026.