Punch list

The short list of small items left to finish before a job, or a unit, counts as done.

Last updated

Punch lists are common at the end of a make-ready: a missing outlet cover, a door that sticks, touch-up paint. Each item gets checked off, ideally with a photo.

The term comes from construction, where the last walk-through before handover produces a list of small fixes. In property management it shows up at the end of a make-ready, after a larger repair, and before a final inspection. A short list closed fast is the difference between a unit that lists on Friday and one that lists next week.

An example

The final walk on a turned unit finds five items: a missing outlet cover in the bedroom, a closet door that drags, a paint drip on the baseboard, a loose towel bar and a smoke alarm with a dead battery. A technician closes all five in one visit and sends a photo of each.

What a good punch list has

  • One line per item, with the room
  • Who fixes each item
  • A photo when it is done
  • A date by which the whole list is closed