How to confirm a repair is done before you close the work order
How to check a repair really happened before you close the work order: what to ask the vendor, one text to the tenant and proof to ask for by repair type.
Last updated
On this page
The vendor texts “all done” at 4:40 PM ET. You close the work order, mark the invoice for payment and move on. Nine days later the tenant calls: the sink still drains slowly, and it has the whole time. Now you have an unhappy tenant, an invoice you already approved and a vendor who is not sure which visit you mean.
Most of the time “done” really means done. The trouble is the times it does not, because you only find out when the tenant calls back. A few habits close that gap. None of them take long, and together they mean you only close a work order when someone who was there can say the problem is gone.
Why “done” is not always done
- The vendor fixed what they saw, and the tenant meant something else. The request said “bathroom leak”. The vendor tightened a supply line. The tenant was talking about the ceiling stain under the tub.
- It was a temporary fix. The water is shut off at the valve or the breaker is reset, and the real repair needs a part. The vendor counts the visit as done. The tenant does not.
- Nobody got in. The tenant was not home, the lockbox code was wrong or the dog was loose. Some vendors mark this as complete because they went.
- It worked when they left. A drain that runs clear for ten minutes can clog again by evening. A furnace that fires once can short-cycle overnight.
- The note went to the wrong place. The vendor told the tenant the part is on order, and nobody told you.
None of these are about bad vendors. They come from the gap between what was asked, what was done and who heard about it. The fix is to make “done” mean the same thing to everyone before the visit, then check it the same way after.
Step 1: Write down what done looks like before the visit
Put one sentence in the work order that describes the finished state, in words the tenant would use. “Kitchen sink drains in under a minute with the tap full on.” “Heat reaches 68°F in the living room within an hour.” “Back door locks and unlocks with the tenant’s key.” Send that sentence to the vendor with the job.
This one line does most of the work. The vendor knows what you will check. The tenant knows what to look for. And when the reports disagree, you have something to compare them against.
Step 2: Ask the vendor for proof of the fix
When a vendor reports the job finished, ask for three things in the same message. Make it part of how every job closes, so it never feels like you are singling anyone out.
- A photo or short video of the finished work. The faucet running, the new part in place, the thermostat reading.
- One sentence on what they did. “Replaced the wax ring and reset the toilet” tells you far more than “fixed”.
- Anything left open. A part on order, a second visit needed, something else they noticed while they were there.
If the answer to the third question is yes, the work order is not done. Change the status to waiting on a part or a return visit, and put the expected date on it.
Step 3: Ask the tenant one clear question
The tenant lives with the repair, so they are the best check you have. Text them after the vendor reports the job finished, and ask one question they can answer in a word.
Timing matters. For a drain, a leak or a heating problem, wait until the next morning, around 9:00 AM ET, so the tenant has used the fix overnight. For a lock, a light or an appliance that either works or does not, the same afternoon is fine.
If the tenant does not reply, send one reminder the next day. If there is still no answer, decide on a rule and stick to it. One common rule: close the work order after two unanswered texts and note on it that the tenant did not reply. That way the record shows you asked.
Step 4: Check the repairs a photo cannot prove
Some repairs need a measurement or a test that the vendor or tenant can do in a minute. Here is a short reference for the jobs that come up most.
| Repair | What done looks like | Proof to ask for |
|---|---|---|
| Drain or toilet clog | Drains fully with the tap or tank full, no backup in other fixtures | Short video of it draining; tenant confirms the next morning |
| Leak | Dry under the fixture and on the ceiling below | Photo of the dry area and the replaced part; tenant checks again in 24 hours |
| Water heater | Hot water at the tap at the set temperature | Photo of a thermometer reading at the tap; the CPSC suggests 120°F to help avoid scalds |
| No heat or cooling | The home reaches the thermostat setting and holds it | Thermostat photo after an hour of running; tenant confirms the next morning |
| Outlet, switch or breaker | Works without tripping under normal use | Note on the cause and the fix; tenant confirms after using it |
| Smoke or CO alarm | Sounds when the test button is pressed | Video of the test; photo of the manufacture date on the back |
| Lock or door | Locks and unlocks with the tenant’s key, closes without forcing | Tenant confirms the same day |
| Paint disturbed in a home built before 1978 | Work area cleaned and checked under the EPA lead rule | The certified renovator’s cleaning check and records |
The last row deserves a note. Under the EPA’s Renovation, Repair and Painting rule, paid work that disturbs paint in homes built before 1978 must be done by a certified firm using certified renovators, and that includes plumbers, electricians and in-house maintenance staff. Small jobs that disturb six square feet or less of paint per room inside, or 20 square feet or less outside, are generally not covered, though window replacement always is. When the rule applies, a certified renovator must check the cleaning after the work, with a visual inspection and wet cleaning cloths compared to a verification card. Ask for that record before you close the work order.
Step 5: When the vendor and the tenant disagree
Sooner or later the vendor says fixed and the tenant says no. Do not pick a side from your desk. Ask the tenant for a photo or a video of what they see, and send it to the vendor with the done sentence from step 1.
- If the problem is the same one the vendor worked on, ask the vendor to come back. Most vendors stand behind recent work, so ask whether the return visit is under their warranty before you approve a new charge.
- If it is a different problem, open a new work order and link it to the first one, so the history stays together.
- If you cannot tell, hold the invoice until the return visit, and tell the vendor that is why.
Whatever you decide, write it on the work order. If the same repair comes back a third time, that history is what tells you to look for a bigger problem or a different vendor.
A close-out checklist
Before you mark any work order complete, check that you have:
- The done sentence, written before the visit
- A photo or video of the finished work
- One line from the vendor on what they did
- A yes from the tenant, or a note that two texts went unanswered
- Nothing left open: no part on order, no return visit pending
- The invoice matching what was approved
- For homes built before 1978 where paint was disturbed, the lead rule records
Our work order process guide covers the steps before this one, from intake to booking. If the vendor is the part that stalls, why vendors don’t answer has habits that get faster replies.
Make it routine, or it will not happen
The steps above take a few minutes per job. Across a full week of work orders, they turn into an hour or two of texts, reminders and follow-ups, and they are the first thing to slip when the phone gets busy. Put them on a schedule: confirmation texts go out every morning for the jobs finished the day before, and every Friday you look at anything closed without a tenant reply.
Confirming the fix and closing the work order is one of the jobs our AI team takes on. Every message and every reply is recorded on the case, with who it went to and when, so you can see why a job was closed. See how it works.
Sources
- U.S. Consumer Product Safety Commission, Avoiding Tap Water Scalds, Publication 5098: the 120°F water heater setting and checking the temperature with a thermometer at the tap. Checked October 20, 2026.
- U.S. EPA, Renovation, Repair and Painting Program: Contractors: who must be certified, homes built before 1978 and the six and 20 square foot thresholds. Checked October 20, 2026.
- 40 CFR 745.85, Work practice standards (Cornell Legal Information Institute): post-renovation cleaning verification by a certified renovator. Checked October 20, 2026.