In‑house maintenance technicians vs outside vendors: how to route each job
When a repair should go to your own maintenance technician and when to call an outside vendor, with a routing table, a checklist and the license questions.
Last updated
On this page
Once you have a maintenance technician or two on payroll, every work order comes with a small decision. Do you send it to your own person, or do you call the plumber? Most teams make that call from memory, one job at a time. That works until the technician is booked solid with small jobs while a vendor bills you for something your own team could have done in twenty minutes.
A written routing rule fixes most of that. Here is how to build one: what in-house technicians are good for, what belongs with a licensed vendor, and the order to try people in so jobs do not sit waiting for someone to decide.
Why the routing decision matters
A technician is a fixed cost. You pay for the hours whether the calendar is full or empty, so every job they can do well is one you are not paying a vendor for. The Bureau of Labor Statistics put the median annual wage for general maintenance and repair workers at $49,590 in May 2025, before benefits and payroll costs. A technician sitting idle while vendors take simple jobs is the most expensive version of that salary.
Vendors are a variable cost. You pay per job, often with a trip charge, and you get a license, specialist tools and insurance that your own staff may not carry. The trade-off is control: a vendor works for many managers and your job waits its turn. Our post on why vendors don’t answer covers that side.
Neither one is better. The goal is to send each job to the cheapest person who can do it safely, legally and soon enough.
What usually suits an in-house technician
Technicians earn their keep on frequent, lower-risk work where knowing the property speeds things up:
- Small plumbing fixes that do not touch supply lines or gas: running toilets, slow drains, faucet cartridges, toilet flappers and wax rings
- Doors, locks and hardware: sticking doors, cabinet hinges, closet tracks, lock changes between tenants
- Appliance checks before a repair call: is it plugged in, is the breaker tripped, is the filter clogged
- Patch and paint, caulking, drywall repairs and most of the punch list on a turnover
- HVAC filter changes, smoke and carbon monoxide detector batteries, and routine inspections
- First look at anything unclear. A technician who can see the problem in person turns a vague tenant report into a clear vendor job with photos.
What usually belongs with a licensed vendor
Send a job to a vendor when it needs a license, a permit, specialist equipment or insurance your team does not have. BLS notes that maintenance workers may need a license or certification for specialties such as electrical or plumbing work, and that the requirements vary by state and locality. Check your state and city rules before you write your list.
- Electrical work beyond swapping a fixture or an outlet cover, especially panels, new circuits and anything that needs a permit
- Gas lines and gas appliances, including water heaters and furnaces on gas
- Main sewer lines, root intrusion and anything that needs a camera or a jetter
- HVAC refrigerant work, which EPA rules under Section 608 of the Clean Air Act limit to certified technicians
- Roofs, structural repairs and anything above a safe ladder height
- Pest control, which often needs a state applicator license
- Warranty work, where the original installer should come back under their warranty
A routing table you can adapt
Use this as a starting point. Change the rows to match what your technicians can do and what your local rules allow.
| Job | First choice | Why |
|---|---|---|
| Running toilet, slow drain | Technician | Common, quick, no license in most places |
| Lock change at move-out | Technician | Routine and time-sensitive on a turnover |
| Dead appliance | Technician first, then vendor | A quick check often finds a simple cause |
| No heat, gas furnace | Vendor | Gas work and often a license |
| No cooling, refrigerant leak | Vendor | Refrigerant work needs EPA certification |
| Main line backup | Vendor | Needs a camera, jetter or excavation |
| Breaker keeps tripping | Technician to look, vendor to fix | Diagnosis is safe, rewiring is licensed work |
| Roof leak | Vendor | Height, materials and warranty |
| Turnover punch list | Technician | Many small tasks across one unit |
Set the order: technicians first, then vendors
When a job could go either way, try your own team first. You already pay for their time, they know the building and they answer your texts. The vendor is the fallback when nobody on staff is free or qualified. To make that work, write down a simple order for each trade:
- Can a technician do this job safely and legally? If not, skip straight to the vendor list for that trade.
- Does a technician have room on their calendar soon enough? Decide what “soon enough” means for urgent and routine jobs, such as same day for urgent and within three business days for routine.
- Offer it to the technician. Give them a short window to accept, for example by 2:00 PM ET the same day.
- If nobody takes it, offer it to your first vendor for the trade, then your backup vendor.
- If nobody takes it after that, a person decides. Someone on your team owns the job and picks the next step.
The point of the order is that nobody has to remember it. A new office hire, a part-time assistant and you on a Saturday should all route the same leak the same way.
Run technicians as staff
A common mistake is to run in-house technicians through the same process as outside companies: the same mass text, the same portal, the same wait-and-see. Technicians are your staff. They need a clear daily queue, the tenant’s access details, photos and the right to say “this needs a vendor” without being second-guessed.
- Give each technician one place to see their jobs for the day, with addresses, access notes and photos.
- Let them hand a job off. If a technician opens a wall and finds a job that needs a license, they should be able to send it to the vendor list with their notes and photos attached.
- Ask for proof when they finish. A photo or a short note makes the work order easy to close and protects you if the tenant reports the problem again.
- Keep them on the on-call calendar only if they are paid for it. On-call rules depend on how restricted their time is, so check with your payroll adviser.
After hours: who takes the night calls
Technicians often end up on the night phone because they are the people who can actually fix something at 2:00 AM ET. That works when the rules are written down: who is first on call, who is the backup, and which calls are true emergencies. Everything else should wait for the morning with a promise to the tenant about when they will hear back.
If you do not have a written emergency list yet, our post on what counts as a maintenance emergency has one you can adapt. For how nights work with now ours, see after hours and emergencies.
Hire or keep using vendors?
Adding a first technician makes sense when you can fill most of their week with jobs you currently send to vendors. To check, pull the last 90 days of work orders and mark each one as “technician could do it” or “needs a vendor”. Then add up two numbers:
- What you paid vendors for the jobs a technician could have done, including trip charges
- The hours those jobs would take a technician, plus drive time between properties
If the hours would fill most of a full-time week and the vendor spend comes close to the cost of a technician with benefits, a hire is worth a serious look. If the jobs are scattered across a wide area or most of your work needs a license, vendors are probably still the better fit. Our post on what a maintenance coordinator really costs shows how to add benefits to a public wage figure.
Employee or contractor?
Some managers keep a handyman on a 1099 and treat them like staff. Be careful. The IRS looks at the whole relationship: behavioral control (whether you direct how the work is done), financial control (who sets pay, supplies tools and covers expenses) and the type of relationship (contracts, benefits and whether the work is ongoing and central to your business). A person who works only for you, on your schedule, with your tools, may be an employee. Talk to your accountant before you set it up.
A routing checklist for your team
- A written list, per trade, of what technicians do and what goes to a vendor
- Your state and city license rules for plumbing, electrical, HVAC and pest control checked
- An order for each trade: technicians first, then the first vendor, then a backup vendor
- A window for accepting a job, with a time in ET
- One person who owns any job nobody takes
- A way for technicians to hand a job to a vendor with notes and photos
- A photo or note required before a job counts as done
- An on-call calendar with a backup, and on-call pay checked with your payroll adviser
- A W-9 and a current certificate of insurance on file for every vendor
Where Now Ours fits
This is what we build, so read this section with that in mind. If you would rather not run the routing above by hand, see how now ours works with your own team on in-house technicians and with outside companies on vendors.
Sources
- U.S. Bureau of Labor Statistics, Occupational Outlook Handbook: General Maintenance and Repair Workers, median annual wage for May 2025 and licensing note, last modified August 27, 2026. Checked October 20, 2026.
- IRS, Independent contractor (self-employed) or employee?, the three categories of common-law evidence, last reviewed May 19, 2026. Checked October 20, 2026.
- U.S. EPA, Section 608 Technician Certification, certification for work on equipment that could release refrigerants, last updated March 3, 2026. Checked October 20, 2026.